The reasons to commission K-12 schools are the same as the reasons for commissioning any facility. However, the primary benefits that most K-12 schools are hoping to gain from the commissioning process are as follows:
Verify and document safe indoor air quality
Energy savings
Training and documentation for operations personnel
What can be more important than providing our children with a healthy environment in which to learn and grow? As a reaction to serious, highly publicized, and highly litigated indoor air quality problems in schools over the past few years, very few school districts are skimping on the design of HVAC systems these days. They are able to raise money in the name of providing healthy facilities that promote learning, and they know that their funding sources - the community in general and parents in particular – will be checking up on them.
Meeting expectations typically includes providing a minimum of ASHRAE 62 ventilation rates to all occupied spaces, controlling maximum relative humidities, and doing it all in the most energy conservative manner possible. This is often achieved with HVAC equipment, systems, and controls the likes of which the building operators have never seen before – nor have the design engineers and contractors, in some cases.
The verification/validation aspect of commissioning is critical for schools, as is the training required to maintain and document on-going proper operation over the life the facility. Schools in some jurisdictions are required to prove that they have maintained healthy indoor environments during occupied hours, and there are people - primarily parents – checking those records.
What is intriguing and disturbing at the same time is the fact that, in our commissioning assignments, K-12 schools have been notoriously “deficient” during the first round of testing. It’s as if the contractors weren’t in tune with the critical nature of their work and didn’t take seriously the fact that the owner would, indeed, be checking their work. The following are sample findings from actual verification test reports from an elementary school. These are typical of the type of things we are finding when the construction project is “complete and ready for demonstration.” What happened to quality control, quality assurance, and pride in a job well done?
OPERATION:
DOCUMENTATION
Engineered Systems, March, 2003